Overview
- Document Type and Issuing Authority: This is a roadmap jointly issued by the Government of India (Ministry of Power) and the Government of Sikkim (Energy & Power Department).
- Publication Date: The document was published in 2015.
- Background/Context: Sikkim, with its challenging terrain and low population density, faces unique obstacles in achieving universal electricity access. Despite being a hydro power hub, about 14,000 households lacked electricity access at the time of publication.
- Objectives: The primary objective is to provide 24x7 reliable power to all households, agriculture, industry, and commercial entities by FY19. The roadmap aims to connect all unconnected households, ensure adequacy in generation, transmission, and distribution, promote renewable energy and energy efficiency, and improve the financial viability of the power sector in Sikkim.
- Scope: The roadmap covers interventions in generation, transmission, distribution, renewable energy, and energy efficiency, with a focus on inclusive and sustainable development.